Case studies

    Change is real when the work changes.

    A closer look at the operational problems, practical interventions, and results IBS has helped organizations pursue.

    01 / The work, made visible
    01

    High-SKU Manufacturing Facility

    Folder-Gluer Changeover Reduction

    Challenge

    A high-SKU-mix environment was crippling folder-gluer productivity with long, inconsistent changeovers. Setup practices varied wildly by shift, undermining daily output targets and eroding schedule reliability.

    What IBS did

    IBS deployed a comprehensive SMED analysis to separate internal and external setup tasks, standardized critical settings for rails, belts, and glue systems, and developed visual setup guides by SKU family with hands-on operator training.

    What changed
    • 30-40% reduction in changeover time
    • Increased daily line availability
    • Improved schedule adherence

    Annual Savings: $150,000-$200,000 | Payback: <5 months | ROI: 2.2x

    02

    Multi-Line Production Facility

    Compressed Air Leak Prevention

    Challenge

    Undetected air leaks and unstable pressure caused cycle variation, tooling failures, and excessive energy consumption across a 12-line configuration.

    What IBS did

    Full ultrasonic leak audit with tag tracking, pressure/flow sensors at each line, upgraded air dryers with dew point monitoring, and PM integration.

    What changed
    • 14% reduction in energy costs
    • 60+ compressor trips eliminated annually
    • 120 hours/year of unplanned downtime eliminated

    Annual Savings: $270,000 | Payback: ~6.2 months | ROI: 1.93x

    03

    Manufacturing Operations Team

    Leader Standard Work & Tiered Management

    Challenge

    Leaders spent most of their time firefighting with no structured escalation process and limited visibility into execution gaps across shifts.

    What IBS did

    Defined role-specific Leader Standard Work, designed SQDCP-aligned tier boards, established management cadences, and coached leaders during live execution.

    What changed
    • Faster issue identification and resolution
    • Improved plan-vs-actual performance
    • Cultural shift toward accountability

    Annual Savings: $140,000 | Payback: <6 months | ROI: 1.6x

    04

    Industrial Manufacturing Plant

    Maintenance Planning & Reliability Improvement

    Challenge

    Reactive maintenance dominated operations with routinely deferred preventive work, leading to frequent unplanned stoppages.

    What IBS did

    Reviewed maintenance backlog and failure history, standardized PM routines, aligned priorities with production needs, and established downtime tracking with root cause reviews.

    What changed
    • 18% reduction in unplanned downtime
    • Improved asset availability
    • Better maintenance/production coordination

    Annual Savings: $210,000 | Payback: ~7 months | ROI: 1.5x

    05

    Manufacturing & Distribution Company

    Business Process Optimization, Order to Production

    Challenge

    Late engineering changes, incomplete work orders, and material availability issues created delays, rework, and expediting costs.

    What IBS did

    Mapped end-to-end order-to-production process, identified handoff gaps and bottlenecks, clarified ownership, and implemented governance controls.

    What changed
    • Improved schedule stability
    • Reduced expediting and rework
    • Faster customer response

    Annual Savings: $160,000 | Payback: ~6 months | ROI: 1.6x

    06

    Fortune 500 Industrial Group

    Global Manufacturing Optimization

    Challenge

    Persistent production bottlenecks and rising operational costs across three continents.

    What IBS did

    Implementation of a standardized Operational Excellence framework and Value Stream Management.

    What changed
    • 22% reduction in global lead times
    • $14M annual cost savings through waste elimination
    • Standardized processes across 12 manufacturing sites
    07

    Leading Tech Hardware Manufacturer

    Supply Chain Resilience Transformation

    Challenge

    Vulnerability to market volatility and logistics disruptions.

    What IBS did

    End-to-end supply chain redesign with advanced risk evaluation and buffer optimization.

    What changed
    • 35% improvement in supply chain responsiveness
    • Zero production stops during major regional disruptions
    • Improved inventory turnover by 18%
    08

    Regional Healthcare Provider

    Strategic Culture Realignment

    Challenge

    Low employee engagement and stagnant patient satisfaction scores.

    What IBS did

    Executive coaching and leadership development focused on a culture of continuous improvement.

    What changed
    • 40% increase in staff engagement scores
    • Top-decile patient satisfaction ranking achieved in 18 months
    • 25% reduction in administrative overhead
    + / Your operation

    Your operation

    The next useful story starts with what is happening now.

    Talk with us about the work, the people closest to it, and where a practical change could begin.